North Logan Logo[navicon.htm]

Copyright (c) North Logan City, 1998
All rights reserved

Design Standards Technical Manual

 

NORTH LOGAN CITY DESIGN STANDARDS TECHNICAL MANUAL

Click on any section listed below in blue and it will take you to a copy of that section of the

Design Standards Technical Manual. 

TABLE OF CONTENTS

CHAPTER 100. Introduction and Purpose

CHAPTER 200. Definitions.

CHAPTER 300. Storm Water Design Standards (newly adopted Mar 3, 2010)

CHAPTER 400. Final Plat Signature Boxes Specified Standard Form

CHAPTER 500. General Improvements Requirements

CHAPTER 600. Soils, Re-vegetation, and Landscaping

CHAPTER 700. Subdivision Infrastructure Improvements.

CHAPTER 800. Design Standards.

CHAPTER 900. Earthwork.

CHAPTER 1000. Excavation for Pipelines.

CHAPTER 1100. Pipe Installation and Embedment.

CHAPTER 1200. Final Backfill.

CHAPTER 1300. Pipe Materials.

CHAPTER 1400. Sewer Manholes.

CHAPTER 1500. Valves, Hydrants and Miscellaneous Items.

CHAPTER 1600. Thrust Restraint Design and Construction.

CHAPTER 1700. Testing of Pipelines.

CHAPTER 1800. Portland Cement Concrete.

CHAPTER 1900. Asphalt Surfaces and Base Courses.

CHAPTER 2000. Restoration of Surface Improvements.

CHAPTER 2100. Severability and Effective Date.

DSTM Drawings